Data center colocation · November 2026
Where colocation capacity is open in the US.
High-density space is built to order and sold before it is finished. We asked operators directly what they can deliver: megawatts open today, megawatts on the way, and the largest single block at each site. Operator and building names are withheld. Every listing carries a Slate36 ID.
01 / Map
Capacity by state.
Pick a delivery window and a cooling type. Brighter states hold more megawatts. Select a state to narrow the listings.
States ranked, MW
02 / Listings
Every open block, indexed.
| Listing | Region | Cooling | MW now | MW coming | Timing | Largest block | Status | Notes |
|---|
03 / Method
How to read this.
- Figures are as reported by each operator on the date shown against the listing. Capacity changes daily. Nothing here is a hold or a quote.
- "MW coming" is capacity operators describe as pre-sell, under construction or planned. Delivery windows are cumulative: "By end of 2027" includes everything available sooner.
- "Under offer" listings are in negotiation or pending sale with another party. They appear in the table and are left out of the map and every total.
- "Air-cooled" includes sites where the operator checks liquid-cooling readiness case by case. "Liquid-capable" means the space is designed for liquid cooling or can convert to it.
- Capacity dated 2028 or later, or with no date, is mostly large wholesale or single-tenant space. Some of it is already in talks.
- Regions are shown at metro or state level. One megawatt is treated as 1,000 kVA.
Operator-reported figures dated October 28 to November 11, 2026. Operator and site names are withheld. Availability is not guaranteed.
Next step
Tell us the requirement once.
Send the listing ID, the power you need per rack and in total, your cooling type and your target date. We confirm what is still open and register it with the operator the same day.
Tell us the requirement will@slate36.com