Slate36Start a conversation
01 · Infrastructure and data centers

Capacity for the hardware you already have on order.

High-density, liquid-cooled space moves in weeks, and the deciding constraints are power per rack, cooling and the date it can be energized, not floor space. We take your requirement once and register it with every operator that can actually hold it.

How it’s bought
Provider-paid
Operators pay the advisor. $0 to you.
  • GPU colocation sourcing

    Racks, kW per rack, cooling method, market and ready-for-service date go to a dozen operators the same day. You get back the sites that fit, with pricing, term and energize dates, and we negotiate from there. Direct-to-chip liquid cooling at 130–150 kW per rack is the typical requirement we place.

  • Connectivity and interconnection

    Tier-1 IP transit, dedicated internet, wavelengths, dark fiber, internet exchange and cloud on-ramps. Designed for the deployment, sourced from carriers we work with every week, and contracted on terms that line up with the colocation agreement.

  • Managed IT and remote hands

    Monitoring, patching, endpoint security and on-site hands for the deployment and for the office behind it. For regulated environments we scope HIPAA, SOC 2 and audit requirements into the managed service, not on top of it.

  • Contract and vendor management

    We stay on after move-in: co-terming agreements so they can be rebid together, tracking renewals, and handling the vendor conversations so your team doesn't have to.